Line Down? Emergency Support
// Collect your data Capture
// Capacity & projects Shift Hero Projects Control panels
Book a Meeting →

Red Lion discontinued and phase-out parts

1 Red Lion parts that are being retired or have gone. Each page shows the ECS stage, Red Lion's own published term where there is one, the successor where one exists, and what to do next. How the stages work.

Red Lion G3 HMI

An ECS engineer capturing a control panel on a tablet: PLC, drive and power supply identified and synced to Command Centre

Running Red Lion kit that's on its way out?

A Capture audit finds every PLC, drive and HMI on your site, takes a backup of each one it can reach, and records the software version and cable needed to restore it. When a discontinued unit fails and a replacement turns up, the program is ready to load.

  • Every device located, photographed and lifecycle-checked
  • Backups taken on the day, with software version and cable recorded
  • Findings report, plus a populated Command Centre
  • No production downtime
See how Capture works

Other manufacturers