Line Down? Emergency Support
// Collect your data Capture
// Capacity & projects Shift Hero Projects Control panels
Book a Meeting →

Guides, checklists and operational breakdowns.

Practical content for engineering managers, operations directors and IT teams responsible for manufacturing automation. No registration required. Speak to us if you want the full version.

Practical engineering resources.

Guide 6 min read

BRCGS and PLC programs: what the standard does and doesn't say

BRCGS Food Safety doesn't mention PLCs by name. Where automation still meets the standard, through HACCP changes, CCPs and equipment, and what to have ready.

Read the guide →
Guide 5 min read

IEC 62443 and your OT asset inventory

What IEC 62443 is, why every part assumes you know what is on your network, and how an inventory, versioned backups and access logs support alignment.

Read the guide →
Guide 7 min read

NIS2 for UK food groups with EU sites

NIS2 isn't UK law, but it covers food production in the EU. Who's in scope, what Article 21 asks for, how it reaches UK suppliers, and what to have ready.

Read the guide →
Guide 7 min read

OT asset governance: what UK manufacturers need in place

Which cyber and audit rules actually apply to a UK manufacturer's OT, where NIS2 still matters, and the four records that answer most assessor questions.

Read the guide →
Guide 6 min read

What is OT asset management?

OT asset management is keeping a current record of every PLC, HMI, drive and network device: what it is, what it runs, how to restore it and if it's still made.

Read the guide →
Reference Updated monthly

Discontinued PLC and Automation Parts Lifecycle

Lifecycle status for discontinued and phased-out PLCs, drives, HMIs and I/O from Siemens, Rockwell, Mitsubishi and more, with what each stage means and what to do next.

Open →
Checklist 5 min read

OT Asset Management: The Manufacturer's Checklist

Eight questions to ask before your next audit. Covers PLC backup status, version control, engineer knowledge retention and compliance readiness.

Request this guide →
Guide 8 min read

IT Security Questions to Ask Before Remote PLC Support

A practical guide for IT and OT managers evaluating remote support tools. Covers device management, session controls, access logging and IEC 62443 alignment.

Request this guide →
Guide 6 min read

Engineering Cover Without the IR35 Headache

How a managed engineering service differs from direct contractor recruitment. What to look for, what questions to ask, and how to protect your organisation.

Request this guide →
Analysis 7 min read

The Real Cost of OEM Callout Dependency

A breakdown of direct and indirect costs: callout fees, wait times, production downtime, overtime and the hidden risk of single-brand support contracts.

Request this guide →
Checklist 6 min read

What to Include in a Control Panel Specification

A practical guide for engineering and procurement teams commissioning new or replacement control panels. Covers enclosure ratings, OEM preferences, documentation requirements and handover.

Request this guide →

Not sure which service fits your situation?

Tell us what you are dealing with. We will tell you honestly whether ECS can help and which product is the right starting point.