Siemens S7-1200 G1 end of life: what UK sites need to know

Enhanced Control Solutions · · 5 min read

Siemens has started phasing out the first generation of the SIMATIC S7-1200, now called the S7-1200 G1. The phase-out began on 1 November 2026. Its successor is the S7-1200 G2, and Siemens says “all future innovations” will be on the G2 only.

The S7-1200 is one of the most common small PLCs in UK machines, from packing lines to utilities. A G1 keeps running exactly as it did on 31 October. What changes is how long you can buy one new, and how long Siemens will supply spares.

The dates

Milestone Date What it means
Phase-out begins 1 November 2026 Siemens’ official start of the product phase-out
Order new units by 30 September 2027 New G1 units can be ordered until the end of September 2027
Spare parts Until about 2036 G1 modules planned to be available as spare parts

Siemens’ own sources give slightly different end dates for new units. Its downloadable migration overview says new parts are available until 1 October 2027, while its S7-1200 migration web page says 31 October 2027. We use the earlier date: place any order you cannot afford to miss by 30 September 2027, and confirm with your distributor.

After the last new-unit date, G1 parts move to spare-parts supply. That is a different thing from buying new: availability and lead times are less predictable, and a spare-parts commitment is not a promise of stock on the day you need it.

What is affected

Siemens’ announcement covers the first-generation S7-1200 family: the CPUs, digital and analogue I/O, safety modules, communication modules, and technology modules and accessories. It runs to many article numbers once SIPLUS and other variants are counted, so check each one you hold against Siemens’ list.

The G1 CPUs are the 1211C, 1212C, 1214C, 1215C and 1217C, plus the fail-safe 1212FC, 1214FC and 1215FC, in their DC/DC/DC, AC/DC/relay and DC/DC/relay versions. Their article numbers mostly end in -40-0XB0, for example 6ES7214-1AG40-0XB0 for a CPU 1214C DC/DC/DC.

All 19 G1 CPUs are now in our lifecycle index, each with its G2 successor where Siemens lists one. Signal and communication modules will follow once we have checked them against Siemens’ article list.

Older S7-1200 units, with article numbers ending -30 or -31, were already being withdrawn. They are in the index too, with their status.

The G2 replacements

Siemens’ migration overview maps each 1212C, 1214C, 1212FC and 1214FC to a G2 CPU of the same type and power supply. For example, the CPU 1214C DC/DC/DC (6ES7214-1AG40-0XB0) maps to the G2 CPU 1214C DC/DC/DC (6ES7214-1AH50-0XB0).

There are gaps to plan around:

  • No like-for-like G2 for the 1211C, 1215C, 1217C or 1215FC. Siemens’ overview compares the 1211C with the G2 1212C, and the 1215C and 1217C with the G2 1214C. A 1215C or 1217C replacement needs checking against I/O, memory and analogue requirements.
  • Some modules are not yet available for G2. Siemens lists IO-Link, energy meter, PROFIBUS, CAN and weighing modules as still in development.
  • It is not a drop-in swap. The G2 is narrower, the PROFINET ports move to the top, wiring moves to push-in terminals, and it needs TIA Portal V20 or later.

Our S7-1200 G1 to G2 migration guide covers the differences and the conversion in detail.

Your options

Buy spares before the new-unit window closes. This suits machines with a few years left, or lines where a G2 migration needs a stop you cannot get yet. Buy against a count of what you actually run, by article number and firmware, and make sure you hold a current backup of each program. A spare CPU without the program, and the TIA Portal version to load it, is only hardware.

Migrate to G2. For new machines and major upgrades, the G2 is where Siemens’ development is going. Siemens provides a TIA Portal add-in with a Migration Checker and a Migration Tool, but some steps stay manual, and the hardware changes mean panel work.

In practice, usually both. Specify G2 for anything new, buy spares for the G1 machines you will keep running, and plan migrations around planned stops.

Start with a count

Either route needs the same information: how many S7-1200 CPUs and modules you run, which article numbers and firmware versions, which TIA Portal version each project needs, and whether you hold a current copy of each program.

A Capture audit records every controller and module on site and takes a backup of each program, with the software version and cable needed to restore it. Command Centre then keeps that record current and flags parts like these as their lifecycle status changes. If you would rather talk it through first, contact us.

Sources

This page summarises Siemens’ published information. Confirm specific article numbers and dates with Siemens or your distributor before ordering.